Hi,
After a lot of problem I finally got my Exchange 2013 in my company up and working.
Now I have decided to move this exchange to a new better server because it is currently running on a Network/File/Domain Controller server and I want the Exchange to have its own server.
My question is which the best way to do the transfer with minimun down-time because we get orders all the time.
When I get my new server, can I setup all the settings on a trial 2013 and when I feel ready uninstall Exchange on 2008 Server and activate it on new 2012 Server?
How can I transfer all mailboxes and settings?
Is there something different I should think about when I'm deploying on a domain member instead of a domain controller?
Iam thankfull for every hint I can get, I want this done with minimum issues ;)
After a lot of problem I finally got my Exchange 2013 in my company up and working.
Now I have decided to move this exchange to a new better server because it is currently running on a Network/File/Domain Controller server and I want the Exchange to have its own server.
My question is which the best way to do the transfer with minimun down-time because we get orders all the time.
When I get my new server, can I setup all the settings on a trial 2013 and when I feel ready uninstall Exchange on 2008 Server and activate it on new 2012 Server?
How can I transfer all mailboxes and settings?
Is there something different I should think about when I'm deploying on a domain member instead of a domain controller?
Iam thankfull for every hint I can get, I want this done with minimum issues ;)